RIVER CROSSINGS Mississippi River Gas Transmission Crossing
St. Louis, MO

Mississippi River Gas Transmission Crossing

1,400 LF of 16" steel casing beneath the Mississippi River for a major natural gas transmission line.

Outcome

Completed 11 days ahead of schedule with zero environmental incidents. Bore diameter: 22". Depth: 85 ft below riverbed.

RIVER CROSSING PIPELINE STEEL CASING
RIVER CROSSINGS Ohio River Water Main Crossing
Louisville, KY

Ohio River Water Main Crossing

900 LF of 24" HDPE water main beneath the Ohio River for regional water authority.

Outcome

Navigated complex geology including cobble and fractured limestone. Delivered within 5% of original budget.

RIVER CROSSING WATER MAIN HDPE
RIVER CROSSINGS Mannassas VA Telecom Crossing
Manassas VA

Mannassas VA Telecom Crossing

1,200 LF of 6" HDPE telecom conduit for regional ISP expansion.

Outcome

Completed in 9 days. Environmentally sensitive corridor — zero impact to protected area

River Crossings Fiber Optic Environmental
MUNICIPAL Missouri American  Water District Expansion
St Louis Mo

Missouri American Water District Expansion

22 miles of water distribution infrastructure across 6 municipalities in the greater St Louis metro area.

Outcome

Largest single HDD contract in Arizona history at time of completion. 100% on-time delivery across all phases.

Municipal Water Main Multi-Phase
MUNICIPAL Mass FTTH Deployment
Chicago, IL

Mass FTTH Deployment

Fiber optic FTTH Throught Illinois 1,236,0000 Million Ft Constructed

Outcome
Municipal Fiber Optic Urban
PIPELINE Eagle Rock VA  Windmill Farm
Eagle Rock VA

Eagle Rock VA Windmill Farm

3,100 LF of 14" HDPE For Transmission,Telecom and Natural Gas First ever Windmill Farm built in VA

Outcome

Completed during active shipping traffic. Bore depth 110 ft. No disruption to channel operations.

Pipeline River Crossing Industrial
PIPELINE Appalachian Natural Gas Lateral
Charleston, WV

Appalachian Natural Gas Lateral

4,200 LF of 4" HDPE lateral through mountainous terrain with multiple creek crossings.

Outcome

Navigated 7 separate geological formations. Completed in challenging winter conditions ahead of schedule.

Pipeline River Crossing Difficult Terrain
Fiber Optic City of Springfield Fiber Optic Backbone
Springfield ,MO

City of Springfield Fiber Optic Backbone

18 miles of fiber optic conduit installation through downtown Springfield MO for municipal broadband expansion.

Outcome

Delivered on budget across 47 individual bore segments. Minimal surface disruption in high-traffic urban core.

Fiber Optic Municipal Urban
Road Crossings Interstate 70 Utility Corridor
Kansas City, KS

Interstate 70 Utility Corridor

Multiple bores totaling 800 LF beneath I-70 for water, gas, and telecom conduit installation.

Outcome

Zero lane closures. All bores completed within KDOT right-of-way requirements. 6 separate utility crossings.

Road Crossing Multi-Utility Highway

Have a Project in Mind?

Our estimating team responds within 24 hours. Tell us about your bore and we'll put together a competitive quote.

REQUEST A QUOTE